Submitter

Client Information

Job Documents

Browse
Browse

Project Type

Request

PBS CERTIFICATION

Browse
Browse
Browse

PBS MANUFACTURER CERTIFICATION

Browse
Browse
Browse

NEW DESIGN APPROVAL

This will be the Design Approval owner/holder
For example: - Priority 1. Payload height: 3.3m - Priority 2. Tyre choice (size and load rating) - Priority 3. Optimise mass or load volume - Priority 4: Length
Browse
Browse
Browse
Browse

VARIATION TO DESIGN APPROVAL

For example: - Priority 1. Payload height: 3.3m - Priority 2. Tyre choice (size and load rating) - Priority 3. Optimise mass or load volume - Priority 4: Length
Browse
Browse
Browse
Browse

ASSESSOR SIGN-OFF (ASO)

Details for the invoicing

ie.  T610SAR drive suspension and front overhang,  Tag trailer S-dim


Free field for any pertinent details, ie “Expected sign off without simulation

If an Escalation is required: Provide any justification for priority escalation here and mark email as High Importance

Browse
Browse
Browse
Browse

CONCEPT PRELIMINARY EVALUATION

Browse
Browse

HEAVY VEHICLE ACCESS (HVA)

Browse
Browse

ADR / ROVER CERTIFICATION

AVE CERTIFICATION

Browse

Other Information